Land
£200,000
Orchard Way, Ormesby, Middlesbrough, Cleveland TS7
Our summary
  • Unique chance to purchase a development opportunity in Ormesby, which situated behind the properties lying north of The Pied Piper pub, shown in the location plan
  • The has lapsed planning permission for six residential bungalows, a copy of the land pack can be provided by contacting the Land Team
  • The lapsed planning (Planning Ref: R/2016/0286/oo) was for Six Semi-detached Bungalows all with individual allocated parking
Land
£400,000
Letch Lane, Carlton, Stockton-On-Tees TS21
Our summary
  • Located on Letch Lane on the way to Carlton on the outskirts of Stockton-On-Tees, a residential development with full planning permission for 4 x 4 bedroom detached dormer bungalows all with 1 single garage each
  • Located on Letch Lane on the way to Carlton on the outskirts of Stockton-On-Tees, a residential development with full planning permission for 4 x 4 bedroom detached dormer bungalows all with 1 single garage
  • 8 acres of with full planning permission for the erecting of 4 detached dwellings in a semi-rural setting
Land
£150,000
Manor House Farm, Newton Bewley, Billingham TS22
Our summary
  • The plot is suitable for a single luxury single dwelling, outline planning permission for which has already been granted
  • Please note that the site plan refers to the entire site, please call for clarification on specific plot for sale
Land
£200,000
Gypsy Lane, Nunthorpe, Middlesbrough TS7
Our summary
  • Located off Gypsy Lane, these exclusive serviced building plots come with full planning permission for a three storey four bedroom detached home offering approximately 2,700 sq
Land
£240,000
Gypsy Lane, Nunthorpe, Middlesbrough TS7
Our summary
  • Located off Gypsy Lane, these exclusive serviced building plots come with full planning permission for a three storey four bedroom detached home offering approximately 2,700 sq
Land
£180,000
Wolviston Road, Billingham TS22
Our summary
  • A fantastic opportunity for someone looking for a self-build opportunity with all the pre-planning work done for you
  • 226 acre plot has detailed planning permission for a 1no
  • Detailed planning permission can be found on Stockton Borough Council Site
  • Planning Ref: 20/0690/rem
Land
£180,000
Ormesby Bank, Ormesby, Middlesbrough TS7
Our summary
  • A fantastic opportunity for someone looking for a self-build opportunity with all the pre-planning work done for you
  • 30 acre plot has detailed planning permission for 1no
  • Detailed planning permission can be found on Redcar & Cleveland Council Site
  • Planning Ref: R/2015/0515/ff
Land
POA
Oxbridge Lane, Stockton-On-Tees TS19
Our summary
  • A rare residential development opportunity
  • Exceptional Opportunity for Builders, Developers or Investors
  • This sizeable plot of freehold land is immediately available with outline planning permission for two properties with garaging
  • This is an ideal opportunity for a builder, developer or for an investor to project manage the development of two properties for which there is outline planning permission granted
  • Planning Permission was approved by the Planning Officer on 15th January 2020 under planning application 19/873/out
Land
POA
Boosbeck Road, Skelton-In-Cleveland, Saltburn-By-The-Sea TS12
Our summary
  • A rare opportunity to acquire land with outline planning permission to build three detached dwellings
  • Planning Ref:
  • Outline Planning Granted 15/7/19
  • The boundary walls and fences shall thereafter be maintained unless the express consent of the Local Planning Authority is given
  • Unless otherwise agreed by the Local Planning Authority in writing, development other than that required to be carried out as part of an approved scheme of remediation must not commence until parts (a) to (c) have been complied with
  • (a) Site Characterisation An investigation and risk assessment, in addition to any assessment provided with the planning application, must be completed in accordance with a scheme to assess the nature and extent of any contamination on the site, whether or not it originates on the site
  • The contents of the scheme are subject to the approval in writing of the Local Planning Authority
  • The written report is subject to the approval in writing of the Local Planning Authority
  • The report of the findings must include: (i) a survey of the extent, scale and nature of contamination; (ii) an assessment of the potential risks to: • human health, • property (existing or proposed) including buildings, crops, livestock, pets, woodland and service lines and pipes, • adjoining land, • groundwaters and surface waters, • ecological systems, • archeological sites and ancient monuments; (iii) an appraisal of remedial options, and proposal of the preferred option(s)
  • (b) Submission of Remediation Scheme A detailed remediation scheme to bring the site to a condition suitable for the intended use by removing unacceptable risks to human health, buildings and other property and the natural and historical environment must be prepared, and is subject to the approval in writing of the Local Planning Authority
  • (c) Implementation of Approved Remediation Scheme The approved remediation scheme must be carried out in accordance with its terms prior to the commencement of development other than that required to carry out remediation, unless otherwise agreed in writing by the Local Planning Authority
  • Following completion of measures identified in the approved remediation scheme, a verification report (referred to in PPS23 as a validation report) that demonstrates the effectiveness of the remediation carried out must be produced, and is subject to the approval in writing of the Local Planning Authority
  • An investigation and risk assessment must be undertaken in accordance with the requirements of part (a) and where remediation is necessary a remediation scheme must be prepared in accordance with the requirements of part (b), which is subject to the approval in writing of the Local Planning Authority
  • Following completion of measures identified in the approved remediation scheme a verification report must be prepared, which is subject to the approval in writing of the Local Planning Authority
  • (e) Long Term Monitoring and Maintenance A monitoring and maintenance scheme to include monitoring the long-term effectiveness of the proposed remediation over a period of 10 years, and the provision of reports on the same must be prepared, both of which are subject to the approval in writing of the Local Planning Authority
  • Reason for pre-commencement: The information is required prior to any works commencing on site it relates to land contamination details which are often the first works on site and relate to site preparation
Land
£175,000
Land For Sale - Durham Road, Thorpe Thewles TS21
Our summary
  • ** A Fantastic Development Opportunity ** Serviced Plot of Land with Planning Approved for a Contemporary Detached Four Bed House with Double Detached Garage