Sponsored Find a Solicitor — free quotes via ReallyMoving
Land
Next Steps
Sponsored — free quotes via ReallyMoving
Find a Solicitor
Land purchases need specialist legal advice — compare fees
Our Summary
- Self-Build plot with planning
- The design concept behind the self-build plots at Newmans Fields is to ensure full integration with the wider site connecting with the site infrastructure, including both vehicular and pedestrian networks
- The nine self-build plots will be accessed via adoptable highways
- The design Framework strikes a balance between the need to create a cohesively designed development, and the freedom and flexibility expected when designing within the self-build culture
- Outline planning permission has been granted via Appeal (under planning reference app/V0510/W/21/3282449 & Reserved Matters submission 23/00146/rmm) for the self-build plots by East Cambridgeshire District Council
- However, due to the age of the Outline application, a Full planning application would need to be submitted for each of the self-build plots
- For further details on what is required for submission to ecdc and the subsequent planning process, please visit: And Details relating to persimmon Homes approval will be further explained at the time of agreeing a sale
- (This would be secured contractually and act as additional control over and above any relevant timescales detailed in the planning permission) provided infrastructure
- 5 - Access to the self-build plots will be fixed in accordance with the wider site Masterplan
Get alerted when similar properties are listed — Subscribe
Description
The property is a self-build plot with planning, located on the edge of a new development on the northern outskirts of town, near a school and railway station. The plot has utility connections to its boundaries and is one of nine available plots in the area. The plot is 5.5 metres wide and will have a designated vehicular access point, with services including access to foul and surface water drainage and connection points to utilities such as gas, water, electricity, and telecommunications.
The building will have a maximum of two and a half storeys, with a range height of 2-3 metres, and will be designed to minimize overlooking and blend in with the surrounding development.